Configuring Waste

Before OEE Quality calculations can be performed, waste count information is required. Because of the varied approaches of determining waste on a production line or process, the OEE/Downtime Module allows different methods for collecting waste information such as started vs. finished, product waste entries, run waste count tag, and more.